After a few days of work the Grizzly cyclone collector is mostly up. I still need to install the filter. Installation went mostly uneventfully except for a few problems, all spurring from the fact that I wanted to mount the cyclone with the filter facing the opposite direction shown in all of the instructions and photos. The impeller and motor mount is not symmetrical front to back so when you mount it to the wall reversed you need a thicker lower mounting plate. The filter mounts also don't work that way, so I am fabricating new ones. Other than those few problems the installation was quite easy.
I'm now working on the ductwork. I have the starter from the cyclone plumbed until the compound miter saw and the other vertical drops for the router table and sander finished. I still need to plumb in everything for the table saw and jointer, but I have to order a few wyes before I can plumb those in.
Saturday, October 07, 2006
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment